Operations and extension of the existing Red Line and construction of the Green Line, 27km in length, $1,300M, since 2020... A system of fast lanes and 2 mega parking lots, 10,500 car space and electric bus-shuttles, to ease congestion in Tel Aviv..
Relevance: 4.8780427