TITAN

Updated 49 days ago
  • ID: 12835673/110
P.O. Box 694 Carroll, IA 51401
The US Forest Products Laboratory built the first SIP structure in 1935; however, energy efficiency concerns didn't exist until fuel prices increased. The first increase, in 1974, saw the cost of crude oil rise from $11.45 per barrel to $18.21, a jump of over $6.75 per barrel or 59%. Product performance and affordability were impacted by the introduction of oriented strand board in 1981, which eliminated the use of plywood... SIPs combine structural framing, insulation, and sheathing into one step, therefore providing the opportunity for more projects per year. SIPs are easier to work with during the cold winter months. Sip walls can usually be erected in 1-2 days, with roof erection taking about the same time. After quickly installing the panels, the rest of the time on the project can be spent completing the work on the interior... SIPs reduce job site waste by reducing the cost of waste disposal. According to statistics, the average builder pays $750 per 2,000 sq. ft. home for..
Primary location: Carroll United States
  • 0
  • 0
Interest Score
1
HIT Score
0.00
Domain
titansips.com

Actual
www.titansips.com

IP
170.249.216.186

Status
OK

Category
Company

People Also Viewed


  1. MAC - mac-international.com
  2. MCCLURE MEDIA & PR - mccluremediapr.com
  3. AMBUJA NEOTIA - ambujaneotia.com
  4. XLPE-POWERCABLE.COM - xlpe-powercable.com
  5. ADASTRA CONSULTING LTD
0 comments Add a comment