NORTH SEA
Updated 61 days ago
United Kingdom
ONE-Dyas, together with its partners Hansa Hydrocarbons and EBN, intends to extract natural gas from field N05-A and from surrounding fields in the German and Dutch North Sea. The proposed platform location is about 20 kilometres north of the islands of Borkum, Rottumerplaat and Schiermonnikoog. The N05-A platform will be located in the Netherlands, approximately one and a half kilometres from German waters. Platform N05-A will be the first Dutch offshore gas treatment platform in the North Sea to run entirely on wind energy. For this purpose, a cable will be installed to the nearby German wind farm Riffgat. This means that the emissions are near-zero during the drilling and production phase. In addition, ONE-Dyas uses an existing pipeline which is already in the North Sea, so only a short new pipeline as a side branch is needed to bring the natural gas to land. Platform N05-A has been designed to be suitable for the production of green hydrogen in the near future... The Ministry of..