P-DELTA

Updated 419 days ago
  • ID: 51311491/2
BS Civil Engineering, University of Tehran, Iran, 2013 PROFESSIONAL ENGINEER
Performed detailed analysis of the WMATA bridge within the Zone of Influence (ZOI) of the tunnel based on the as-built plans of the structure. Evaluated the existing condition of the structure by applying permanent and transient loads required by the WMATA design manual. Train live load, impact load, derailment force, and load combinations were per WMATA specific requirements. Applied the impact of tunnel construction activities by imposing support settlements obtained from geo-mechanical modeling. Provided recommendations based on the comparison of the results with and without support settlements. Prepared comprehensive report to present Analysis results and findings.
Primary location: Tehran Iran
  • 0
  • 0
Interest Score
1
HIT Score
0.00
Domain
parsaheydarpour.wordpress.com

Actual
parsaheydarpour.wordpress.com

IP
192.0.78.12, 192.0.78.13

Status
OK

Category
Company
0 comments Add a comment