More Fields

Filters

Profiles which have:

Recent Changes

Profiles with recent changes to:
Sign up to Download

1-8 of 8 results

  • norannreconstruction.com
  • 1
The Municipality of Anchorage Project Management & Engineering Department (MOA PM&E) is planning to upgrade the following Norann Subdivision roadways: W. 57 th Avenue, W. 58 th Avenue and a portion of Cope Street (see map below for project limits)...

Relevance: 89.43837
  • birchroadphase2.com
  • 1
MOA PWA has contracted with CRW Engineering Group, Inc. (CRW) to provide engineering and design services... The Mountain Park-Robin Hill Rural Road Service Area (RRSA) in coordination with the Municipality of Anchorage Public Works Administration..

Relevance: 88.83053
  • camrosedrivedrainage.com
  • 2
MOA PM&E has contracted with CRW Engineering Group, Inc. (CRW) to provide preliminary engineering and design services. CRW has evaluated alternatives to improve the drainage and roadways and the design is nearly complete. The 95% design documents can..

Relevance: 83.897095
  • tashadrivereconstruction.com
  • 1
The Municipality of Anchorage (MOA) is planning to reconstruct Tasha Drive (from Flamingo Drive to Northwood Street) to meet current MOA design criteria for a local roadway...

Relevance: 83.897095
  • 32nd33rdupgrades.com
  • 5
  • 4
  • 4
Construction of W. 30th Avenue / North Star Street Phase 1 improvements was completed in 2022. The design team is working on the 95% design for the W. 32nd Avenue and Calais Drive Phase 2 improvements that extend from the western side of the C Street..

Relevance: 83.897095
  • 48th-cordovareconstruction.com
  • 3
  • 3
  • 3
The Municipality of Anchorage (MOA) is planning roadway and drainage improvements on 48th Avenue and Cordova Street. The project area includes approximately a half mile of roadway on E. 48th Avenue from Old Seward Highway to Cordova Street and on..

Relevance: 83.897095
  • shotguncoveroad.com
  • 1
  • 1
The project would construct a new two-lane gravel road that extends approximately 2.5 miles from the existing Shotgun Cove Road terminus to Trinity Point, running parallel to Passage Canal, as well as adjoining access roads and recreational..

Relevance: 79.63084
  • 42ndavenueupgrade.com
  • 2
The MOA has contracted with CRW Engineering Group, Inc. to provide preliminary engineering and design services. With the passing of the Anchorage Road and Drainage Service Area (ARDSA) bond in the April 2024 election, Phase 1 is now funded through..

Relevance: 79.63084