BASSBEAMS
Updated 82 days ago
19 Drakensberg Street, Cato Ridge, 3680 Give us a ring
The Unique design of the BassBeam Single Tee Slab, in combination with the use of PreStressed Reinforcing, alows us to span up to 12.5m without any propping...
The concrete topping laid on of our beams does not need to cure for the full 28 days. Construction can continue within 24-48 hours as soon as the intial set is complete...
Precast Propless Self Supporting Suspended Floor Slabs and Decking. An alternative to hollow core, block and lintel, cast-in-situ and waffle slabs.