EG LNG

Updated 195 days ago
  • ID: 13115313/145
In January 2002, Marathon Oil Corporation acquired CMS Energy's interest in the Alba Field and together with the other Alba Field PSC Contractors (Noble Energy and Globex)and GEPetrol commenced a production expansion project. LNG was selected as the preferred method for monetizing the Alba Field gas. Bechtel Corporation was awarded the Front End Engineering Design (FEED) contract in November 2002. In November2003, Bechtel completed the FEED work and commenced pre-EPC groundbreaking activities at the plant site. In June 2004, the Final Investment Decision (FID)was approved. Subsequently, Mitsui and Marubeni acquired 8.5% and 6.5%interests in EG LNG, respectively. In 2006, GEPetrol's25% stake in EG LNG was transferred to Sociedad Nacional de Gas de Guinea Equatorial (Sonagas G.E.S.A.)("SONAGAS"), the newly formed national gas company of Equatorial Guinea. After subsequent transfers and additional equity increases over the years, EG LNG's current shareholders are: Marathon E.G. LNG..
  • 0
  • 0
Interest Score
4
HIT Score
0.69

Managing Director
Domain
eglng.com

Actual
www.eglng.com

IP
34.249.200.254, 52.17.119.105, 63.35.51.142

Status
OK

Category
City or Goverment Website
0 comments Add a comment