TC-114
Updated 258 days ago
- Age: 117 years
- ID: 13371643/135
TC-114 establishes Project Teams (PT), ad-Hoc Groups (AHG), Maintenance Teams (MT) and liaisons with other IEC Technical Committees as needed. TC-114 has formal liaisons with TC-4 (Conventional Hydopower) and TC-88 (Wind), and SC 8A (Grid Integration of Renwable Energy Generation) and informal liaisons are established with other organizations both within and outside IEC as needed.