HYDROACTION
Updated 207 days ago
Heroon Polytechneiou 9 Zografou Campus 15780 Athens, Greece
The Hydroaction survey was completed and one lucky respondant won a free participation to the Hidroenergia 2010 conference...
HYDROACTION - Development and laboratory testing of improved action and Matrix hydro turbines up to 5 MW, designed by advanced analysis and optimisation tools for optimizing productivity and cost...
HYDROACTION will develop a methodology for optimizing the design of hydro turbines up to 5 MW, with regard to productivity and cost. The standardisation and application of the methodology will contribute to the development of cost-efficient, tailor-made turbines for small hydro plants with optimum performance.