A substancial amount of wind power, 30-60 GW, is foreseen in the northern part of the North Sea. These wind farms have to be connected to the national grids of five different countries in a flexible and economical way. Individual connection is straightforward but for several reasons possibly not the best choice. A high capacity North Sea Transnational Grid connecting wind farms to the national grids and at the same time connecting the national grids may well be a better solution for reasons of energy efficiency, availability, controllability, lower costs and the possibility to trade/exchange electricity.
  • 0
  • 0
Interest Score
1
HIT Score
0.00
Domain
nstg-project.nl

Actual
www.nstg-project.nl

IP
134.221.44.39

Status
DomainNotFound

Category
Company
0 comments Add a comment