LAZAR PAVIC

Updated 10 days ago
  • ID: 38629320/55
Construction of road bridge for second lane of the highwe. Bridge structure consists of concrete approach bridge length of 600m (16×37.5m) on the left river bank, main steel structure over river length of 583m (88+99+99+198+99m) and concrete approach bridge length of 800m (23×30+17.5+3×25+ 17.5m) on the left bank.Value of the project is 30 milion euros... Project Management over construction of multistorey residential building. Total surface is about 10,000 m2 which includes: 2 underground levels (garages), retails units in ground floor, parking space on the high ground floor and 8 floors with apartments... Supervision for construction of new Airport Flight Control building at Karljevo Airport. Total surface is about 1500 m2. Building facility includes tower 30m high. "Smart house" concept is accomplished by means of all integrated automation systems.
  • 0
  • 0
Interest Score
1
HIT Score
0.00
Domain
lazarpavic.com

Actual
www.lazarpavic.com

IP
212.129.3.5

Status
OK

Category
Company, Other
0 comments Add a comment