LINCOLN GAP WIND FARM

Updated 37 days ago
  • Age: 7 years
  • ID: 40962093/48
The Lincoln Gap Wind Farm will ultimately consist of 468MW of wind turbines. Construction started in 2017 and 35 turbines of the 126MW Stage 1 are fully operational, 24 turbines of the 86MW Stage 2 commenced generation into the national grid on 14 December 2021, and a further 256MW is under development. The project also includes a 10MW grid scale battery storage and is located near Port Augusta in South Australia.