ALLENTOWN INFRASTRUCTURE GROUP

Updated 25 days ago
  • ID: 49310674/17
4315 Independence Dr, Schnecksville, PA 18078
The Open-End Friction Pile is fabricated and assembled by Allentown Infrastructure Group. The piling is produced from the specific structural steel elements determined in the engineered design. Allentown Infrastructure Group is a member of AISC and operates under AISC procedures... The Open-End Friction Pile Products were designed, engineered, and field tested by an National Industry Leading Consulting Engineering and Scientific research firm. Their team conducted stringent field tests to verify and validate design values of the products... After galvanizing, the Friction Pile is assembled with each bolt is torqued to the-engineered 28 kips.
Primary location: Schnecksville United States
  • 0
  • 0
Interest Score
4
HIT Score
0.00
Domain
allentownig.com

Actual
allentownig.com

IP
100.34.224.80

Status
OK

Category
Company

People Also Viewed


  1. SOUTHFIELD ARTS CO LTD
  2. DOYON UTILITIES - doyonutilities.com
  3. BRUNTONS LTD.
  4. FOOTPRINT - footprintintl.com
  5. WESTWOOD MUSIC GROUP - westwoodmusicgroup.com
0 comments Add a comment