The initial design daily throughput is 16,000 tonnes per day, with an availability of 75% used in designing the crushing circuit and 93% for the design of the rest of the plant... Three stage crushing, consisting of a primary gyratory crusher, a secondary cone crusher and two tertiary cone crushers. The primary gyratory crusher, the three cone crushers and the three vibrating screens will each be housed in steel-framed buildings, with covered conveyors transporting material between each stage. The crushed ore stockpile will be covered to prevent freezing;