The building is heated with a steam heating system, there is no air conditioning and neither the main building nor the addition contains adequate controls over the heating system as the pneumatic control system has failed in various areas. The heating and ventilation systems were installed in 1953 with the addition of the Sisson School and requires update/replacement of its components and controls. The steam boilers have been replaced in the last ten years as well as associated pumps and steam return systems, however, the lack of adequate controls has resulted in inconsistent maintenance of temperature in the building.
Also known as: Pickering Middle School
  • 0
  • 0
Interest Score
1
HIT Score
0.33
Domain
pickeringmsbuildingproject.com

Actual
pickeringmsbuildingproject.com

IP
45.76.7.192

Status
OK

Category
Educational Institution
0 comments Add a comment